Biomass Drying System

  • Class 1 Div 1 Explosion Proof
  • Extracts remaining ethanol from fibers
  • Completely Closed System – No vapors, contaminated liquid or risk of exposure
  • Reduced Disposal Costs
  • Low Maintenance – Designed and constructed for maximum duty cycles.
  • Heater Set Point – Attain process temperature faster and maintain the temperature more efficiently.
  • Auto Cool Down – Decreases cycle time by cooling the distillation vessel at the end of the process
  • 85% Vessel Capacity
  • Potential to recover 100% Usable Biomass
Model L x W x H (in)
BDS - 110 60" x 88" x 106"
BDS - 575 85" x 128" x 126"

* Dimensions are to be used as reference only.

Contact Us Today!

For any inquiries, questions or quotes, please call 1-800-522-7343 or fill out this form.

Head Office

1300 Northwestern Ave
Gurnee, IL 60031

Call Us Today!

P: 1-800-522-7343
F: 1-847-662-4003

Contact
Us Today!

Open Contact Form
WordPress Image Lightbox